Tovar-Valencia, Ruben D., Galvis-Castro, Ayda C., Prezzi, Monica, Salgado, Rodrigo (2018) Short-Term Setup of Jacked Piles in a Calibration Chamber. Journal of Geotechnical and Geoenvironmental Engineering, 144 (12). 4018092pp. doi:10.1061/(asce)gt.1943-5606.0001984
| Reference Type | Journal (article/letter/editorial) | ||
|---|---|---|---|
| Title | Short-Term Setup of Jacked Piles in a Calibration Chamber | ||
| Journal | Journal of Geotechnical and Geoenvironmental Engineering | ||
| Authors | Tovar-Valencia, Ruben D. | Author | |
| Galvis-Castro, Ayda C. | Author | ||
| Prezzi, Monica | Author | ||
| Salgado, Rodrigo | Author | ||
| Year | 2018 (December) | Volume | 144 |
| Issue | 12 | ||
| Publisher | American Society of Civil Engineers (ASCE) | ||
| DOI | doi:10.1061/(asce)gt.1943-5606.0001984Search in ResearchGate | ||
| Generate Citation Formats | |||
| Mindat Ref. ID | 9706782 | Long-form Identifier | mindat:1:5:9706782:3 |
| GUID | 0 | ||
| Full Reference | Tovar-Valencia, Ruben D., Galvis-Castro, Ayda C., Prezzi, Monica, Salgado, Rodrigo (2018) Short-Term Setup of Jacked Piles in a Calibration Chamber. Journal of Geotechnical and Geoenvironmental Engineering, 144 (12). 4018092pp. doi:10.1061/(asce)gt.1943-5606.0001984 | ||
| Plain Text | Tovar-Valencia, Ruben D., Galvis-Castro, Ayda C., Prezzi, Monica, Salgado, Rodrigo (2018) Short-Term Setup of Jacked Piles in a Calibration Chamber. Journal of Geotechnical and Geoenvironmental Engineering, 144 (12). 4018092pp. doi:10.1061/(asce)gt.1943-5606.0001984 | ||
| In | (2018, December) Journal of Geotechnical and Geoenvironmental Engineering Vol. 144 (12) American Society of Civil Engineers (ASCE) | ||
See Also
These are possibly similar items as determined by title/reference text matching only.
