Moosavi, E., Gholamnejad, J. (2015) Long-term production scheduling modeling for the open pit mines considering tonnage uncertainty via indicator kriging. Journal of Mining Science, 51 (6) 1226-1234 doi:10.1134/s1062739115060526
| Reference Type | Journal (article/letter/editorial) | ||
|---|---|---|---|
| Title | Long-term production scheduling modeling for the open pit mines considering tonnage uncertainty via indicator kriging | ||
| Journal | Journal of Mining Science | ||
| Authors | Moosavi, E. | Author | |
| Gholamnejad, J. | Author | ||
| Year | 2015 (November) | Volume | 51 |
| Issue | 6 | ||
| Publisher | Pleiades Publishing Ltd | ||
| DOI | doi:10.1134/s1062739115060526Search in ResearchGate | ||
| Generate Citation Formats | |||
| Mindat Ref. ID | 747540 | Long-form Identifier | mindat:1:5:747540:9 |
| GUID | 0 | ||
| Full Reference | Moosavi, E., Gholamnejad, J. (2015) Long-term production scheduling modeling for the open pit mines considering tonnage uncertainty via indicator kriging. Journal of Mining Science, 51 (6) 1226-1234 doi:10.1134/s1062739115060526 | ||
| Plain Text | Moosavi, E., Gholamnejad, J. (2015) Long-term production scheduling modeling for the open pit mines considering tonnage uncertainty via indicator kriging. Journal of Mining Science, 51 (6) 1226-1234 doi:10.1134/s1062739115060526 | ||
| In | (2015, November) Journal of Mining Science Vol. 51 (6) Pleiades Publishing Ltd | ||
See Also
These are possibly similar items as determined by title/reference text matching only.
